[1]Tang Yuanning,Zhao Xi.Key Material Mill Supervision Mode of High-speed Railway Project: a Case Study of Spray Polyurea,2012 International Conference of Logistics Engineering and Management(ICLEM 2012)
[2]唐元宁,包晓英,Available Production Capacity Constraint of Pull Supply Chain Operating,ICLEM 2010 Proceeding,2010.10
[3]包晓英,唐元宁,Design of Incentive Mechanism Strategy in the Manufacturing/Remanufacturing System, ICLEM 2010 Proceeding,2010.10
[4]唐元宁,蒋畅,多元化企业产业链构建研究——基于铁路产业的实证分析,科技进步与对策,2009,26(20)
[5]冯利朋,周国华,唐元宁,铁路资源对铁路多经交通运输业贡献的定量测度方法,统计与决策,2009(1)
[6]唐元宁,包晓英,基于回收再制造的逆向供应链的契约研究,世界科技研究与发展,2008,30(6)1-117
[7]唐元宁,姚建明,Available Production Capacity Constraint of Pull Supply Chain Operating,2008 International Conference of Chinese Logistics and Transportation Professionals,2008.7
[8]冯利朋,周国华,唐元宁,An Empirical Study of Global Scope Economies Model in Diversified Railway Logistics,2008 International Conference of Chinese Logistics and Transportation Professionals,2008.7